Selected work

Recent bathrooms. Real addresses.

Every job here is one of ours. Tap a project, then use the arrows or tap any photo to see it big.

Follow us on Instagram to stay up to date with our completed, current and upcoming projects.

@phase2renovations · Follow →
Finished St Kilda Road bathroom with marble-look tiles, timber vanity and black-framed shower screen

St Kilda Road, South Melbourne

Full renovationMould & leak repairMarble lookAS 3740

VIC 3205View project →

Finished Geranium Grove bathroom with dark stone-look tiles, twin brushed-brass showers and a freestanding spa bath

Geranium Grove, Mernda

Full renovationTwin showersSpa bathBrushed brass

VIC 3754View project →

Finished Foleys Road shower with grey stone-look tiles, a tiled niche and a new tiled base

Foleys Road, Derrimut

2 shower basesLeak repairTiled nichesAS 3740

VIC 3026View project →

3D design of the new Travancore bathroom: walk-in shower, floating timber vanity and wall-hung toilet

Mt Alexander Road, Travancore

Work in progressWalk-in shower3D designBrushed copper

VIC 3032 · In progressView project →

Full bathroom renovation

St Kilda Road, South Melbourne

Our client called us about mould and water leaks. We drew up a full redesign and completed the whole bathroom renovation from strip-out to handover, with new waterproofing to Australian Standard AS 3740 so the problem won't come back. We finished it all with premium fittings and fixtures.

Mould & leak repairFull redesignAS 3740 waterproofingPremium fittings
Finished St Kilda Road bathroom with marble-look tiles, timber vanity and black-framed shower screenAfter1 / 12

Finished St Kilda Road bathroom with marble-look tiles, timber vanity and black-framed shower screen

Before

Old bathroom with green mosaic shower
Old bathroom with green mosaic shower
Old vanity with frosted-glass cabinet
Old vanity with frosted-glass cabinet

During

Bathroom stripped back to the frame
Bathroom stripped back to the frame
New framing with in-wall toilet cistern
New framing with in-wall toilet cistern
Shower base waterproofed to AS 3740
Shower base waterproofed to AS 3740

After

Finished bathroom from the doorway
Finished bathroom from the doorway
Timber vanity with stone top and black tapware
Timber vanity with stone top and black tapware
Vanity and toilet with LED strip lighting
Vanity and toilet with LED strip lighting
Toilet and vanity with backlit mirror
Toilet and vanity with backlit mirror
Walk-in shower with black rail shower
Walk-in shower with black rail shower

Full bathroom renovation

Geranium Grove, Mernda

Our client called us about loose tiles, mould and a first-floor bathroom leaking through to the ground floor. We stripped it all back and completed a full bathroom renovation, with new waterproofing to Australian Standard AS 3740 to stop the leaks for good. We finished it all with premium fittings and fixtures.

Loose tiles & mouldLeak to ground floor fixedAS 3740 waterproofingPremium fittings
Finished Geranium Grove bathroom with dark stone-look tiles, twin brushed-brass showers and a freestanding spa bathAfter1 / 13

Finished Geranium Grove bathroom with dark stone-look tiles, twin brushed-brass showers and a freestanding spa bath

During

Bathroom stripped back to the frame
Bathroom stripped back to the frame
Stripped room looking toward the door
Stripped room looking toward the door
Floor opened up to the joists
Floor opened up to the joists
New floor sheeting laid
New floor sheeting laid
In-wall toilet cistern framed in
In-wall toilet cistern framed in
Waterproofing done and tiling under way
Waterproofing done and tiling under way

After

Twin brass showers and spa bath behind a full-width screen
Twin brass showers and spa bath behind a full-width screen
Spa bath with brushed-brass tapware
Spa bath with brushed-brass tapware
View through the new sliding door
View through the new sliding door
Fluted timber vanity close-up
Fluted timber vanity close-up
New frosted-glass sliding door from the hallway
New frosted-glass sliding door from the hallway

Two shower base replacements

Foleys Road, Derrimut

Our client's two showers were leaking and full of mould. We replaced both shower bases with new waterproofing to Australian Standard AS 3740, so the leaks are fixed for good, and finished them with premium fittings.

2 showersLeaks & mould fixedAS 3740 waterproofingNew tiled niches
Finished Foleys Road shower with grey stone-look tiles, a tiled niche and a new tiled baseAfter1 / 17

Finished Foleys Road shower with grey stone-look tiles, a tiled niche and a new tiled base

Before

Mould spreading behind the wall tiles
Mould spreading behind the wall tiles
Mouldy grout along the shower hob
Mouldy grout along the shower hob
Failed silicone and mould at the hob corner
Failed silicone and mould at the hob corner
Second shower before the strip-out
Second shower before the strip-out

During

Wall tiles removed, rotted base exposed
Wall tiles removed, rotted base exposed
Water-damaged frame at the base of the wall
Water-damaged frame at the base of the wall
Second shower stripped to the frame
Second shower stripped to the frame
New wet-area board on the first shower
New wet-area board on the first shower
New wet-area board and niche on the second shower
New wet-area board and niche on the second shower
First shower waterproofed to AS 3740
First shower waterproofed to AS 3740
Second shower waterproofed to AS 3740
Second shower waterproofed to AS 3740
New tiled shower base going down
New tiled shower base going down
Wall tiles and niche going up
Wall tiles and niche going up

After

Finished shower base falling to the centre waste
Finished shower base falling to the centre waste
Second shower tiled with its new niche
Second shower tiled with its new niche
Work in progress

Apartment bathroom renovation

Mt Alexander Road, Travancore

We're on this one right now. The old shower over the bath has come out to make room for a walk-in shower behind fluted glass, with a wall-hung toilet, a floating timber vanity and brushed copper tapware throughout. We designed it in 3D first, so our client could see exactly what they were getting before a single tile came off. Since then we've stripped it back to the slab, reframed the walls, set the new plumbing and in-wall cistern, and boarded it out ready for waterproofing. Finished photos coming soon.

Bath to walk-in shower3D designWall-hung toiletBrushed copperAS 3740 waterproofing
3D design of the new Travancore bathroom: walk-in shower, floating timber vanity and wall-hung toiletDesign1 / 17

3D design of the new Travancore bathroom: walk-in shower, floating timber vanity and wall-hung toilet

Before

The Travancore bathroom before, with an old shower over the bath
The Travancore bathroom before, with an old shower over the bath
Old brown mosaic wall and shower over the bath
Old brown mosaic wall and shower over the bath
Old bath and plain towel wall
Old bath and plain towel wall

The design

3D design of the new Travancore bathroom: walk-in shower, floating timber vanity and wall-hung toilet
3D design of the new Travancore bathroom: walk-in shower, floating timber vanity and wall-hung toilet
Design front view: mirror cabinet, recessed shelf, vessel basin and fluted glass shower
Design front view: mirror cabinet, recessed shelf, vessel basin and fluted glass shower
Design cutaway: travertine-look tiles with a sage green vertical tile feature
Design cutaway: travertine-look tiles with a sage green vertical tile feature
Design close-up: timber vanity, vessel basin and brushed copper tapware
Design close-up: timber vanity, vessel basin and brushed copper tapware
Design close-up: brushed copper rail shower and shower ledge
Design close-up: brushed copper rail shower and shower ledge
Design close-up: copper heated towel ladder
Design close-up: copper heated towel ladder

In progress

Balcony and floors covered and protected before work started
Balcony and floors covered and protected before work started
Strip-out underway: vanity wall opened up and toilet removed
Strip-out underway: vanity wall opened up and toilet removed
Bath and tiles out, stripped back to the slab
Bath and tiles out, stripped back to the slab
New shower mixer set out level with a laser
New shower mixer set out level with a laser
New timber framing with the in-wall toilet cistern and new plumbing
New timber framing with the in-wall toilet cistern and new plumbing
Shower wall and half-height ledge framed up, new floor waste in place
Shower wall and half-height ledge framed up, new floor waste in place
Wet-area board on, shower recess ready for waterproofing
Wet-area board on, shower recess ready for waterproofing
Vanity and toilet wall boarded, with flush plate and tap points set
Vanity and toilet wall boarded, with flush plate and tap points set

You've made it this far

Let's build your dream bathroom.

Fast replies, a site visit within the week, and a clear fixed-price quote within 48 hours of seeing your bathroom.