Full bathroom renovations across Melbourne.
Your bathroom stripped right back to the frame, rebuilt to current standards and handed back in about two weeks on site. You get a detailed written quote before anything starts, and Harry is on the tools every day.
What's included
Every layer, done properly.
A full renovation is six stages, one after the other. Each one is listed in your written quote, so you know exactly what you are paying for.
Strip-out & protection
We protect your floors and hallway, then remove tiles, fixtures and linings back to the frame.
Plumbing rough-in
New water and waste lines run to suit your new layout, ready for the fixtures to come.
Framing & sheeting
Frames straightened or replaced and new wet-area board fixed, ready for waterproofing.
AS 3740 waterproofing
Membrane and correct floor falls to Australian Standard AS 3740, checked before any tiling.
Tiling & cabinetry
Walls and floors tiled, then your vanity and cabinetry installed.
Fit-off & handover
Tapware, toilet, shower screen and lighting fitted, a full clean, then a walkthrough with you.
How the job runs
Two weeks, step by step.
The same order of work on every standard bathroom, so you know what is happening each day.
Strip-out
Site protected, room stripped and plumbing roughed in.
Waterproof
Wet-area board, floor falls and AS 3740 membrane.
Build
Tiling, vanity and cabinetry, shower screen measured.
Finish
Fit-off, final clean and handover walkthrough.
Bigger rooms, layout changes or two rooms at once take longer. Your quote sets out the plan before we start.
Selected work
Recent bathrooms. Real addresses.
St Kilda Road, South Melbourne
VIC 3205View project →
Geranium Grove, Mernda
VIC 3754View project →
Foleys Road, Derrimut
VIC 3026View project →
Common questions
Things homeowners ask us.
How much does a full bathroom renovation cost?
Most fall between $15k and $25k. A simpler like-for-like rebuild can start around $10k, and larger rooms with premium finishes can go past $35k. Your written quote confirms the exact price.
Is it always about 14 days?
For a standard single bathroom, yes, once work begins. Larger rooms, layout changes or two rooms together take longer, and we tell you the timeline before we start.
Do you help choose tiles and tapware?
Yes. We help you choose tiles, tapware, vanity and fittings before work begins, so everything is ordered and ready on the day it is needed.
What's included in the quote?
Every stage of the job is listed, from strip-out to the final clean, so you know exactly what you are paying for.
What if we change our minds during the job?
Any change is agreed with you in writing, including any cost, before the work goes ahead.